
49
Section 4 - In Roof Frame Installation
Top Flashings
Starting from the left side. Push top corner ashing (16) under the wind protection rail (15), when
located correctly you should no be able to lift the leading edge. Fix with wood screw 5x30 (23) on the
right joint and with sealing screw (22) from the left side. Continue with parts (17/18/19).
16
22
17
18
23
23
22
Leading Edge
Comentários a estes Manuais