
57
Section 4 - In Roof Frame Installation
Mounting The Flashings
Starting from the left hand side, place the left hand apron ashing onto the top batton (450mm) and
screw into position (just use the top screw holes to secure in place at this point).
Note: Please remove the protective plastic coating from the pieces of ashing before it is installed.
Comentários a estes Manuais