RM Solar S Class 20 Pro Manual de Instruções Página 73

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 88
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 72
72
Mounting The Flashings
Starting at the left hand side mount the top ashing ensuring that the leading edge hooks under
the wind retaining rail. When located correctly you will not be able to lift the leading edge by hand.
Secure in place using 1 x (4x30mm) wood screws (this screw needs to be located as indicated so as
not to compromise the water tightness of the ashings.
Leading Edge
Section 4 - In Roof Frame Installation
Vista de página 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 87 88

Comentários a estes Manuais

Sem comentários