RM Solar S Class 20 Manual de Instruções Página 35

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 68
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 34
35 36
6.4.9 Place the upper support wedge so that the distance between the lower slat (2) and
the upper wedge (7) is 1950 mm. The upper wedge must be supported by at least
two battens (Only use one 110mm screw to hold the wedge in place at this point)
6.4.10 Seal strip: Stick the seal strip (6) along the whole edge of the lower ashing (3) (4)
(5). Place the panels and align them. The distance on each side of the eld should
be 100mm. It is important to check diagonal measurements. A = B.
Vista de página 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 67 68

Comentários a estes Manuais

Sem comentários