
35 36
6.4.11 Panels should be 100mm from the edge of bottom ashing.
6.4.12 Mounting the upper wedge: now secure the upper wedge (7) in place using 6 x
110mm screws (In Total).
6.4.13 Connect the panels together and connect them with pipes (see chapter 5.) and
pressure test the system using either compressed air, or the glycol solution NOT
water.
6.4.14 Insert the panel temperature sensor (brown wire).
Comentários a estes Manuais